A combined npx X control chart to monitor the process mean in a two-stage sampling
This paper proposes a new combined npx X control chart for monitoring the mean of a process. A sample of size n is split into two sub-samples of sizes n1 and n2 =n-n1, determined by an optimization search. The units of the first sub-sample are evaluated by attributes and plotted on an npx control...
Na minha lista:
Principais autores: | , , |
---|---|
Formato: | article |
Idioma: | English |
Publicado em: |
Quality and Reliability Engineering International
|
Assuntos: | |
Endereço do item: | https://repositorio.ufrn.br/handle/123456789/52057 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
id |
ri-123456789-52057 |
---|---|
record_format |
dspace |
spelling |
ri-123456789-520572023-04-05T20:58:22Z A combined npx X control chart to monitor the process mean in a two-stage sampling Sampaio, Elvis S. Ho, Linda Lee Medeiros, Pledson G. de Quality control Monitoring the process mean Control chart Control chart X¯ Npx control chart Combined control chart This paper proposes a new combined npx X control chart for monitoring the mean of a process. A sample of size n is split into two sub-samples of sizes n1 and n2 =n-n1, determined by an optimization search. The units of the first sub-sample are evaluated by attributes and plotted on an npx control chart. If this chart signals an out-of-control condition, then values of the quality characteristic of interest are collected from the units of the second sub-sample, and the sample mean is calculated and plotted on an X control chart. If both control charts signal, then the process is halted for adjustment. The possibility that all n items will not be inspected may lead to a reduction in both the cost and time spent on examining the sampled items. The performance of the proposed procedure is compared to that of two separate X and npx control charts. The proposed procedure exhibits superior performance to the X control chart for a variety of sample sizes, n, and shifts, d, of the target mean. The average time to signal (ATS) for the combined control chart was lower than that calculated for a single X or npx control chart, indicating that the combined control chart is an efficient tool for monitoring the process mean. 2023-04-05T20:57:09Z 2023-04-05T20:57:09Z 2013-06 article SAMPAIO, Elvis S.; HO, Linda Lee; MEDEIROS, Pledson G. de. A Combined npx−X¯ control chart to monitor the process mean in a two-stage sampling. Quality and Reliability Engineering International (Print), v. 30, p. 1003-1013, 2014. Disponível em: http://onlinelibrary.wiley.com/doi/10.1002/qre.1528/abstract;jsessionid=422BA9D78605B9EDDCD6ED5B9CA410E7.f03t03. Acesso em: 08 dez. 2017 https://repositorio.ufrn.br/handle/123456789/52057 10.1002/qre.1528 en Acesso Aberto Quality and Reliability Engineering International |
institution |
Repositório Institucional |
collection |
RI - UFRN |
language |
English |
topic |
Quality control Monitoring the process mean Control chart Control chart X¯ Npx control chart Combined control chart |
spellingShingle |
Quality control Monitoring the process mean Control chart Control chart X¯ Npx control chart Combined control chart Sampaio, Elvis S. Ho, Linda Lee Medeiros, Pledson G. de A combined npx X control chart to monitor the process mean in a two-stage sampling |
description |
This paper proposes a new combined npx X control chart for monitoring the mean of a process. A sample of size n is split into two sub-samples of sizes n1 and n2 =n-n1, determined by an optimization search. The units of the first sub-sample are evaluated by attributes and plotted on an npx control chart. If this chart signals an out-of-control condition, then values of the quality characteristic of interest are collected from the units of the second sub-sample, and the sample mean is calculated and plotted on an X control chart. If both control charts signal, then the process is halted for adjustment. The possibility that all n items will not be inspected may lead to a reduction in both the cost and time spent on examining the sampled items. The performance of the proposed procedure is compared to that of two separate X and npx control charts. The proposed procedure exhibits superior performance to the X control chart for a variety of sample sizes, n, and shifts, d, of the target mean. The average time to signal (ATS) for the combined control chart was lower than that calculated for a single X or npx control chart, indicating that the combined control chart is an efficient tool for monitoring the process mean. |
format |
article |
author |
Sampaio, Elvis S. Ho, Linda Lee Medeiros, Pledson G. de |
author_facet |
Sampaio, Elvis S. Ho, Linda Lee Medeiros, Pledson G. de |
author_sort |
Sampaio, Elvis S. |
title |
A combined npx X control chart to monitor the process mean in a two-stage sampling |
title_short |
A combined npx X control chart to monitor the process mean in a two-stage sampling |
title_full |
A combined npx X control chart to monitor the process mean in a two-stage sampling |
title_fullStr |
A combined npx X control chart to monitor the process mean in a two-stage sampling |
title_full_unstemmed |
A combined npx X control chart to monitor the process mean in a two-stage sampling |
title_sort |
combined npx x control chart to monitor the process mean in a two-stage sampling |
publisher |
Quality and Reliability Engineering International |
publishDate |
2023 |
url |
https://repositorio.ufrn.br/handle/123456789/52057 |
work_keys_str_mv |
AT sampaioelviss acombinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling AT holindalee acombinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling AT medeirospledsongde acombinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling AT sampaioelviss combinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling AT holindalee combinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling AT medeirospledsongde combinednpxxcontrolcharttomonitortheprocessmeaninatwostagesampling |
_version_ |
1773959358939398144 |