Simulação em instalação piloto da adequação de ETA convencional para dupla filtração
There are water treatment plants (ETA) that operate with hydraulic overload, for example ETA Extremoz, located in the state of Rio Grande do Norte, operates with hydraulic overload of 30% in relation to the project flow. Although the project indicates full-cycle technology, ETA Extremoz operates...
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Rannpháirtithe: | |
Formáid: | Dissertação |
Teanga: | por |
Foilsithe / Cruthaithe: |
Brasil
|
Ábhair: | |
Rochtain ar líne: | https://repositorio.ufrn.br/jspui/handle/123456789/25791 |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|